![]() The project was constructed using one of the largest earth coupled geothermal systems in the US with over 100 miles of piping in the ground. This created extremely favorable value to for our client. Breaking such a large project down in this way assured maximum interest from smaller more competitive contractors and at the same time hit perfect windows of opportunity for larger firms that could get in and get out quickly and still meet their other commitments. ![]() Sixty Two bid packages were configured to maximize bidder interest and match up with the market forces available. We served our client as both Construction Manager and Owner’s Representative. This 274,000 SO facility includes a Las Vegas style Casino, a 100 room luxury hotel, convention center, several restaurants, show lounge, luxury spa, indoor and outdoor pools and the name sake Grand Falls waterfall feature. The overall $120 Million dollar project was started in July 2010 and was opened just 11 months later on June 9, 2011. This project was constructed on a remote agricultural site just outside Sioux Falls, South Dakota.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |